Compare complete wall systems

CMU block or Stelcor ICF?

Use one wall plan to compare materials, concrete, reinforcement, labour, build time, insulation and finishes side by side. Every planning rate can be adjusted for your project.

01

Wall project

Enter the same wall dimensions for both systems.

ft
ft
%
corners

Each corner adds one large outside bracket and one small inside bracket per block level.

02  Planning assumptionsView or edit unit prices, quantities, labour and productivity.

Starter rates are transparent planning inputs, not a quote. Update them with supplier and contractor rates for your location. Prices are in Belize dollars and exclude GST, freight, engineering, equipment and foundations.

Shared rates

BZ$/yd³
BZ$/lb

Reinforced CMU

BZ$/block
blocks/ft²
%
BZ$/block
yd³/ft²
lb/ft²
BZ$/ft²
ft²/day
BZ$/ft²
BZ$/ft²

Stelcor ICF

BZ$/block
ft²/block
ft/level
%
yd³/ft²
lb/ft²
BZ$/ft²
ft²/day
BZ$/ft²
BZ$/bracket
BZ$/bracket

Your wall comparison

1,360 sq ft net wall area

1,600 sq ft gross · 240 sq ft openings

Estimated Stelcor ICF savings BZ$0

0% compared with the reinforced CMU installed-wall estimate.

Conventional system

Reinforced CMU

BZ$0
Blocks incl. waste
0
Block + mortar
BZ$0
Concrete / grout
0 yd³BZ$0
Reinforcement
0 lbBZ$0
Labour
BZ$0
Estimated build time
0 crew-days
Separate insulation
BZ$0
Interior + exterior finish
BZ$0

Insulation & finish: separate insulation is included in this estimate, plus interior and exterior finish coats.

Integrated system

Stelcor ICF

BZ$0
Complete forms incl. waste
00 standard brackets
Corner brackets
0 bracketsBZ$0
Forms + corner brackets
BZ$0
Concrete core
0 yd³BZ$0
Reinforcement
0 lbBZ$0
Labour
BZ$0
Estimated build time
0 crew-days
Insulation included
Included
Interior + exterior finish
BZ$0

Insulation & finish: continuous EPS insulation and formwork are included in each Stelcor block; compatible interior and exterior finishes are still required.

What this estimate includes

Wall materials, concrete or grout, reinforcing steel, installation labour, separate CMU insulation, and interior/exterior wall finishes. Waste is applied to block and form quantities.

Planning estimate only. Excludes GST, freight, pumps, scaffolding, equipment, foundations, bond beams, lintels, engineering, permits, waterproofing, paint and services. Confirm design, quantities and current prices with Stelcor and your project team.