Belize wall-system comparison
Compare reinforced concrete block and Stelcor ICF.
Use one wall geometry to compare a standard reinforced CMU wall, the same CMU wall with added insulation, and Stelcor ICF. Quantities are calculated first; costs include only the current material rates shown below.
Planning model · BZ$
Current supplier rates are editable. Structural dimensions and reinforcement must be confirmed by the project engineer.
Side-by-side planning result
All three systems use the same net exterior wall area. The CMU columns and bond beam are included so block is not compared as infill units alone.
1,360 ft² · 126.3 m²
CMU units—
RC columns—
Concrete / grout—
½-in steel · 40-ft bars—
¼-in stirrup steel · 20-ft bars—
CMU unit cost—
Reinforcement cost—
Concrete aggregate component—
Concrete cement componentPending mix
Known material subtotal—Before mortar, formwork, labour, finishes, delivery, GST and any pending concrete cement.
Mortar usage and cost remain project inputs; no Belize rule was supplied.
Thermal basis: no insulation is included. A Stelcor-specific comparison should not assign a tested R-value to local 6-inch CMU without assembly data.
CMU units—
Insulation coverage—
Concrete / grout—
½-in steel · 40-ft bars—
Base CMU materials—
Insulation allowanceQuote required
Known material subtotal—Uses the same exclusions as System A; insulation is added only when a rate is entered.
Enter a supplied-and-installed insulation rate to complete this added line.
Thermal basis: performance depends on the selected insulation, continuity, fixings and finish. The tool does not invent an R-value.
System CStelcor ICF
Locally manufactured forms, galvanized corner braces, reinforced concrete core and continuous EPS faces.
Complete ICF blocks—
Included standard brackets—
Large outside corner braces—
Concrete core—
½-in steel · 40-ft bars—
ICF forms + corner braces—
Reinforcement cost—
Concrete aggregate component—
Concrete cement componentPending mix
Known material subtotal—Before labour, bucks, pump, finishes, termite detailing, delivery, GST and pending concrete cement.
The selected core thickness and reinforcement are planning inputs, not a structural design.
Thermal basis: continuous EPS is included, but Stelcor-specific certified assembly values are not claimed by this calculator.
What the subtotal means
It is the sum of the priced units shown: CMU or ICF forms, reinforcement, concrete aggregate, optional cement dosage and optional CMU insulation. It is not an installed wall price.
Hurricane comparison
Properly reinforced CMU and reinforced ICF can both form robust wall systems. Roof-to-wall connections, openings and the complete load path remain critical and require engineering.
Current Belize rates
Defaults use the supplied BZ price list: 6-inch block BZ$3.40, concrete mix BZ$95/yd³, Progreso 42.5 kg cement BZ$25, ½-inch steel BZ$44/40 ft and ¼-inch steel BZ$7/20 ft.
Preliminary planning comparison only. Quantities rely on visible assumptions and do not establish structural adequacy. Ballpark mode does not quantify opening lintels. Costs exclude mortar unless separately quoted, labour, formwork timber, finishes, drainage planes, bucks, termite treatment, pumping, delivery, remote-location premiums, GST, contingency, foundations, roofs, slabs and professional fees. Have Stelcor and the project engineer review the drawings and specifications before ordering or construction.
Send your plans for a detailed comparison →
Related tools and guidance: Stelcor ICF quantity calculator · ICF vs concrete block in the Caribbean.